London

Twickenham, Bus Depot

Charge Points Installed

150Kw Floor Mounted

In 2023 Cleaner EV Ltd were appointed as the principal contractor for ENEL X.

 

An upgraded 3200amp board from 2500 amp with 10 spare ways for 10 x 250amp MCCBs. Ducts and trenches installed at the same time for upcoming works. Cables have been wired with enough capacity for 200kwh of current should if they need them in the future.

Cleaner Group travels across Europe
Cleaner Group travels across Europe

Location:- Twickenham, London 

Contract:- Abellio & ENEL X 

Project Duration:- 6 months 

Completion Date:- 01.06.2023 